Saturday, September 5, 2009

Monday, August 24, 2009

Sunday, August 23, 2009

Heavier Lifting

This is why I recommend hiring a structural engineering (www.kloesel-engineering.com) to install 400 pound windows!







Saturday, August 15, 2009

Heavy Lifting


Well, in the two months that I haven't posted, we've been busy working. The exterior foam and membrane is nearly complete, and the windows are going in. I'm using a galvanized steel jamb extensions on the outside, installed prior to the window.

Today, we installed one of the large windows, 12+ feet tall and nearly 300 pounds. Nothing a few pulleys and a winch couldn't handle.

Foam Complete
Winch

Jack and Ken and the window being lifted


View from the kitchen.



Saturday, May 30, 2009

Weekend Warriors

Ken and I have been busy.

Here's a summary of the exterior building envelope:
Tyvek home wrap, followed by 3" expanded polystyrene foam with double 2x4 bands for nailers for the siding, followed by Wrap Shield membrane for airtightness and bulk water barrier.




Hey Pops, recognize the pencil in my ear??




Saturday, May 16, 2009

Taking Control

So, Ken and I set up my new aluminum pump jack system today.  It went up pretty easily.  Now he and I can finish the exterior.


Sunday, May 3, 2009

It's electric

The electrical rough in is complete.  Plumber is supposed to start Tuesday.
Here's a look at the second floor.  Straight ahead is the bathroom.  To the left is the mechanical room.  To the right, you fall down to the first floor.


I built a door today to keep the neighborhood thieves away from my copper.